458 List of Goodluck Jonathan Lead Federal Government's Executed and completed capital Projects Across all the 36 States of Nigeria with the exclusion of Abuja(FCT) from 2010 till 2015.

458 List of Goodluck Jonathan Lead Federal Government's Executed and completed capital Projects Across all the 36 States of Nigeria except the federal capital territory, Abuja from 2010 till 2015.

Former President Goodluck Jonathan administration carried out several capital projects to revolutionize the the economy that majored on 8 areas that are heart and soul of the Nigerian economy namely; rehabilitation of the refineries, construction of major roads, building of power plants substations, railways, upgrading and modernization of all the international airports, job creations, provision of major water projects and very importantly agriculture and he succeeded in executing and completing 458 out of the several he initiated within the period 5years he spent in office and that was a landmark that surpasses any other President and head of states that has served before him.
Thanks to Jonathan, agriculture now accounts for 22 per cent of Nigeria’s GDP, more than oil and gas which only account for 15.9 per cent.  Under Jonathan, Nigeria recorded a more than 50 per cent reduction in food imports; from an import bill of N1.4 trillion to less than N700 billion.  With the innovation of dry season rice-farming, Nigeria reached 60% self-sufficiency in rice production and became, according to the Food and Agricultural Organisation of the United Nations (FAO), the largest producer of cassava in the world.
Fashola

It was not surprising when the new Minister for Power, Works and Housing former Lagos State governor Babatunde Raji Fashola on Tuesday while unveiling his plans praised the achievements of the former President Goodluck Jonathan that he ‘Constructed More Roads Than Any Other Nigerian President ever in Nigeria’
during his first news conference tagged “Setting the Agenda for Delivering Change” said that Goodluck Jonathan has constructed more roads than any president ever in Nigeria.
He also acknowledged that the Transformation in the power sector is above 50 % and that he would try to build on it.
Minister of State for Works, Adebayo Adeyeye, also  said that  Jonathan’s administration has recorded more success in the provision of motorable roads than any other administration in the history of Nigeria.
Adeyeye, who spoke as a guest on Channels Television’s Sunrise Daily programme on Monday, insisted that the Jonathan administration has made considerable progress in the road sector, more than any of the governments that have administered the country.
According to him, the administration in 2011 had about 4,500 kilometres of fairly motorable roads, just as he explained that today the administration has about 25,000 kilometres of very good roads.
Breakdown of the Goodluck Jonathan lead administration executed and completed capital projects:
NORTH – EAST GEO – POLITICAL ZONE
TARABA STATE 10 PROJECTS: 
*SURE – P Project on primary Health Care ( PHC) *Construction of Takum and the Kashimbila Multi – Purpose Dam Project in Yangtu. *Establishment of a new Federal University in Wakari, Taraba *e – wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season farming projects *Construction of Silos in Taraba State *Construction of Jalingo – Kuna Lau Road (Section II) *Reinstatement of collapsed section of Wakari – Mutum Biyu Road in Taraba State. *Rehabilitation of Wukari – Takum Road, Wukari /Akwana Road. *Ongoing reconstructionof Zing – Yakoko – Monkin Road *Construction of Perishable Cargo Terminal in Jalingo *Ongoing recinstruction of Zing – Yakoko – Monkin road.
GOMBE STATE 8 PROJECTS:
*Reinstatement of Collapsed section of Gombe – Potiskum road *Construction of Gombe – By Pass Road *Rehabilitation of Gombe – Numan – Yola Road (Section II) *Establishment of a new Federal University in Kashere, Gombe State *SURE – P projects on Primary Health Care (PHC) *e – Wallet System in the distribution of Agricultural Inputs to the farmers and the Dry Season Farming Projects *Construction of Export Crop Preservation and Conditioning *Establishment and Construction of Special AlmajiriSchool Provision of improved Cotton Seedlings Free of Charge for farmers Rehabilitation of Tumu – Pindaiga – Kashere Road Establishment of a new Teaching Hospital
BAUCHI STATE 4 PROJECTS:
*Federal Government spent ₦11Billion on MDG’s Project in Bauchi State as 2013. *SURE – P Projects on Primary Health Centres *e – wallet system in the distribution of the agricultural inputs to farmers and the Dry Season farming Projects – under which incentives were provided for nothing less than 10,000 Dry Season rice farmers in Bauchi State. *Construction/ Rehabilitation of Yashi – Basher – Dengi section in Bauchi and Plateau States and Rehabilitation of Futuk – Yalo Road. *Rehabilitation of Futuk – Yalo Bauchi State *Establishment of Cancers Treatment Centre in Abubakar Tafawa Balewa Teaching Hospital Bauchi
ADAMAWA STATE 18 PROJECTS:
*Establishment and Construction of Almajiri school *Provision of improved Cotton Seedlings free of charge for farmers *e – wallet System for the distribution of agricultural inputs to the farmers and Dry Season farming Projects *Rehabilitation and remodelling the Yola Airport *SURE – P Projects on Primary Health Centres *2 x 60 MVA, 132/33KV substation at Mubi, 2 x 60 MVA, 132 / 33 KV Substations at Gulak 132 KV double circuit transmission line, 30 MVA, 132/33 KV mobitra at Mayo Belwa, Adamawa state. *A new NAF Comprehensive Secondary School Yola commissioned. *Partial State of emergency to enhance democratic stability in Adamawa, Yobe and Borno States *Completion of Yola – Numan road in Adamawa *Ongoing 30MVA, 132/33KV Mobitra at Mayo Belwa, Adamawa State. Yola – song – Litle at Gombi – Mubi – Gulak 132kv Double Circuit Transmission Line. 2 x 60 MVA, 132/33kv *Substations at song, Little Gombi, Mubi and Gulak YOBE STATE: *Gashua – Hadejia 132KV double – circuit trasnsmission line, 2 x 60MVA, 132/33KV substation at Gashua and 2 x 132KV Line Bays Extension at Damaturu and Hadejia Substations. Damaturu – Gashua 132KV double – circuit *Transmission Line and Damaturu 2 x 150 MVA, 330/132KV Substation. *SURE – P Projects on Primary Health Care (PHC) *e – Wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season farming. *Establishment and construction of Special Almajiri School *Provision of improved cotton Seedlings free of Charge for farmers *Gashua Power Station Desertification Control Projects: Establishment of 15 Row Green Belt (80Km) and Presidential Initiative on Afforestation
BORNO STATE 11 PROJECTS:
*Rehabilitation of Uba – Mbala Road *Dualization of Maiduguri – Kano Road *SURE – P Projects on Primary Health Care. (PHC) *Rehabilitation of the Maiduguri Airport *Enugu – PH – Maiduguri Railway Fixed. *e – Wallet system for the distribution of agricultural inputs to the farmers at subsidized rate and *Dry Season Farming projects. *Desertification Control Projects: Establishment of 15 *Row Green Belt (80 Km) and Presidential Initiative on Afforestation *Maiduguri 1 x 150 MVA, 330/ 132KV + 1 X 6 MVA 132 /33 KV substations. *Ongoing Maiduguri 1 x 150MVA, 330/132KV + 1x 60MVA, 132/33KV Substation *33KVA Transmission substation at Damboa / Biu Road. *Completion of Uba – Mbalala Road in Borno State

KEBBI STATE 12 PROJECTS:
* Establishment of new Federal University at Kalgo * SURE P Project on Primary Health Care * Construction of Almajiri school * Provision of Improved Cotton seedlings free of charge for farmers * Establishment of CBN cash office * Building of Silos * Establishment of a federal FM Radio * Railway line * Rehabilitation of federal roads * Construction of new Library in Federal Unity Schools * Construction of expert Crop Preservation & Conditioning Centre * Construction of Silos (100,000 metric tones capacity)
JIGAWA STATE 9 PROJECTS:
* Establishment of new Federal University in Dutse * Construction of Almajiri schools * Establishment of a Federal Polytechnic * Construction of a Laboratory blocks in Jigawa State Polytechnic Dutse * Flood Victims Palliative Scheme * Dry Farming Project * SURE – P Projects on Primary Health Care * Construction of new Library in Federal Unity Schools * Desertification Control Project: Establishment of 15 Row Green Belt(80Km) and Presidential Initiative on Afforestation Program
KADUNA STATE 19 PROJECTS:
* Rail line Zaria/Kaura Namoda rail route * Abuja – Kaduna rail line * Kaduna Airport remodelled * Kaduna Refinery rehabilitation after 15 years * SURE – P Projects in the State Almajiri Schools * Free improved Cotton Seedlings for farmers * Dry Season farming Project * Construction of new Library in Federal Unity school * Revival of the Nigerian Textiles PLC Kaduna and its employees re-engaged. * Construction of Expert Preservation & Conditioning Centre * Ongoing work in Gurara Waterfalls and irrigation projects * Ongoing Kafanchan 2 x 60 MVA 32/33KV substation, Kaduna – Jos 330kv Double – Circuit Line, 2 x 330KV Line Bays Extension at Kaduna * Kaduna Power plant – Mando Road 330kv Double – Circuit Transmission Line and Substation Extension at Mando Road substation 2nd Kaduna – Kano 330KV Double – Circuit Transmission Line * Ongoing 2 x 60 MVA, 132/33KV Substations at kwoi and Kachia * Establishment of a division of the National Industrial Court in Kaduna * Construction of a Storey cell block in Kaduna Prison * Rehabilitation of Agric Skills Training Centre * Federal Government College Rabah Road. Kaduna laboratory refurbished. * Galma Dam Water supply Kaduna State.
KANO STATE 14 PROJECTS:
* Construction of new Airport Terminal/upgrading * Provision of Railway Train Services (Lagoa – Kano) * Upgrading Nigerian Police Academy in Wudil to a University Status * Rehabilitation of Kano – Kastina Federal Road * Rehabilitation of 510Km Kano – Maiduguri Road * Construction of Almajiri schools * Desertification Control Projects * Construction of new Library in Federal Unity school * SURE – P project on Primary Health Care * Dry Season Farming Projects * Ongoing 1 x 30MVA, 132/33kv substation at Wudil Kano State. Kano – Katsina 330KV Double – Circuit Transmission Line and 2 x 60MVA, 132/33KV Substation at Dambatta, Kano state * Rehabilitation and Re -commissioning of the NNPC depot in Kano. * Construction of a storey block for 212 inmate at Kano Central Prison * Establishment of 80 Km of 15– row Green Belt and the Presidential Initiative on Afforestation in Kano and other 10 Northern States.
ZAMFARA STATE 12 PROJECTS:
* Rehabilitation of Funtua – Gusau – Sokoto Road * Establishment of a new Federal University Gusau in January 2013 Almajiri |Schools construction * SURE- Projects on Primary Health Care (PHC) * Dry season farming Project * e-wallet System for farmers * Construction of new Library in Federal Unity school * Rehabilitation of Namoda Jiba Road Section iv in Zamfara State * Rehabilitation of Dangulbi Road in Zamfara, Mainchi – Anka Daki Takwa Road * Construction of Silos (100,000 metric tons capacity) * Rehabilitation of the NNPC Depot in Gusau * Construction of Agricultural Skills Training Centre * Establishment of Cancers treatment Centre at the Federal Medical Centre Gusau
SOKOTO STATE 13 PROJECTS:
* Lagos – Sokoto Railway Project approved March 2014 * Rehabilitation of Funtua – Gusau – Sokoto Road * Dry Season farming Project * Construction of Almajiri schools * Provision of Improved Cotton Seedlings free of Charge for farmers * Desertification Control Project: Presidential Initiative on Afforestation * Relief ( Palliative Scheme) for flood victims * SURE P Projects on Primary Health Care * Construction of new Library in Federal Unity schools * e- wallet System in the distribution of farming inputs supply * Rehabilitation of the Shagari irrigation Project * Rehabilitation of Sokoto Airport * Construction of Silos (100,000 metric tones capacity) * Goronyo Dam Emergency Spill Repairs (Water Supply) Sokoto
KATSINA STATE 18 PROJECTS:
* Establishment of a new Federal University in Dutsin-ma Katsina State * Construction of Almajiri Schools ( Modern Tsangaya School System) * e- wallet System for farmers * Free improved Cotton Seedlings for farmers * Rehabilitation/ consruction of Kano – Kastina Road * Rehabilitation of Kastina – Daura Road * Dry Season Farming Project * SURE P Project on Primary Health Care and others * Desertification Control Project * Rehabilitation of the Umaru Yar’Adua International Airport Katsina * Construction of Silos (100,000 metric tones capacity) * Construction of Kankara Gurbi road. * Ongoing Daura 2 x 30/40MVA substation and 2 x 132KV Line bay extension at Katsina. * Grid Rehabilitation and Reinforcement in Katsina Substation, Kano – Katsina 330KV Double – Circuit Transmission Line, 2 x 150MVA, 330/132KV + 2 x 60MVA, 132/33KV Substation at Katsina, Katsina – Kurfi – Dutsinma – Kankara – Malumfashi 132KV Double Circuit Line, Sub Power Stations in Kurfi (2 x 60MVA, 132/33KV), Dutsinma, Kankara and Malumfashi substation, Kumbotso (Daura) – Dambatta 132KV Line and Katsina – Daura 132KV Double Circuit Line. * Construction of a Storey building Administrative Block and 36 Units of One Bedroom at Katsina by the Nigerian Security & Civil Defence Corps (NSCDC) * Presidential Initiative on Aforestation * 80% Completion of the rehabilitation of existing infrastructure at Jibia Irrigation Projects * Construction of 10MW Wind Energy Generation Companies in Katsina
NORTH CENTRAL GEO POLITICAL ZONE
KOGI STATE 13 PROJECTS:
* Establishment of a new Federal University in Felele – Lokoja * Dualization of the 212 Km Lokoja – Abuja Road, Lokoja Okene – Benin Road * SURE – P Projects on Primary Health Care * e-wallet System for farmers in the distribution of Agricultural Inputs and Dry season Farming Projects * 434 mw Geregu Power Generating Plant ii completed and commissioned in October 2013 * Aladja – Ajaukuta Rail fixed and tested * Kogi state is one of the states proposed for the three Green Field Refineries of the NNPC in alliance with CSECC (Kogi Green Field Refinery Itobe village Kogi State) Jamata River Port at over 50% completion * Establishment/ Construction of a federal High court * Palliative Scheme for flood victims in Kogi State * Food Processing Centre with a capacity of 25,000 metric tones silos * Ongoing 2 x 60MVA, 132/33KV substation at Egbe, 2 x 60 MVA and 2 x 132KV line bays extension at Obajana, Lokoja – Obajana 330kv double – circuit line and 330/132kv substation at Obajana. * Ongoing 132/33kv substation at Ayangba, Kogi State * Construction of Lokoja River Port and Jetties at Idah
NASARAWA STATE 19 PROJECTS:
* Establishment of a new Federal University in Lafia * Road Rehabilitation; Lafia – Makurdi Road * SURE – P Projects on Primary Health Care (PHC) * Construction of new library in the Federal Unity School * Rehabilitation /construction of Lafia – Doma road, Lafia – Obi – Awe Road , Nasarawa – Karsh – Ara Road * Construction of the Loko – Oweto Bridge linking Nasarawa and Benue States * Establishment of Central Bank Lafia * Karshi Power Transmission Station * Lafia Power Sub – Station * Doma Dam 375million cubic meters of water for irrigation * Four storey Federal Secretariat, Lafia with 402 offices constructed * Federal High Court complex constructed * Distribution of computers and internet broadband to schools * Construction of Faculty of Arts Lecture theatre in Nasarawa State University Keffi by the federal Government through the Tertiary Education Trust Fund, and the construction of the faculty of Administration lecture theatre, Faculty of Social Science lecture theatre and construction of Academic staff office complex. * The CBN intervention project in Nasarawa State University; Construction of the school of Post Graduate Studies Complex. * Construction of Export Crop preservation Conditioning Centre * Provision of Portable drinking water at Nasarawa state University Keffi * Establishment of Cancers Treatment Centre at the Federal Medical Centre Keffi * Construction of 3 MDG/NDE Skill Acquisition Centrein each of the three Senatorial Districts of Nasarawa State
NIGER STATE 13 PROJECTS:
* Dualisation of Suleja – Minna Road * Construction of Almajiri Schools * Dry Season Farming Project * Baro Ports on Niger State which was conceived in 1954 came to live under President Jonathan * Construction of Yar’Adua Hospital for highway emergency response at Sabon Wuse Railway Line system * Rehabilitation of Federal Roads * e –wallet System in the distribution of Agricultural Inputs to the farmers * Construction of Bida – Sacci – Nupeko Road * Construction of River Ebba at Cheche, Katcha L.G. A. Area in Niger State. * Ongoing Grid Rehabilitation and Reinforcement in Kontagora Substation * Rehabilitation and re-commissioning of NNPC Depot in Suleja and Minna * Equipped Mathematics and Chemistry Laboratories at the Federal Government Academy, Suleja * Establishment of Maritime Institute at Ibrahim Badamasi Babangida University Lapai
BENUE STATE 11 PROJECTS:
* Rehabilitation of Rail way lines * Rehabilitation of Lafia – Makurdi Road, Aliade to Uturkpo Road * SURE – P Projects in the state * Construction of new library at the Federal Government College Otobi, Benue state * Supply of new improved seedlings to boast groundnut and sorghum production * Palliative reliefs for the Flood victims * Construction of Perishable Cargo Terminal in Makurdi * Ongoing construction of Oweto Bridge to link Benue and Nasarawa State (70% Completed) * Ongoing reconstruction of Makurdi – Gboko, Wannune – Yandev Section Road * Completion of the Greater Makurdi Water Supply Scheme * Construction of Oju – Obussa – Ainu Road
PLATEAU STATE 14 PROJECTS:
* Rehabilitation of Federal Roads: Manchok Vom road * Construction of the Faculty of Social Science, Faculty of Post Graduate Studies, International * Conference Centre and hostels in University of Jos Funded by CBN through TET Fund. * 120Mw Power sub- station in Makeri- Jos Completed. * Panshin Sub power Station * SURE – P (Subsidy Re –investment Programme) Projects in the state * Rehabilitation of Railway line from Kuru Station in Plateau state to Bauchi station * Construction of Barkin Ladi Dam in Plateau state * Rehabilitation of buildings at Police Staff College Jos * e- Wallet for Farmers and Dry Season Farming Projects. * Construction of Jarmai – Bashar road and rehabilitation of Bashir – Dengi road * Ongoing Kaduna – Jos 330kv double – circuit line, 2 x 330kv line bays extension at Jos substation * Construction of Perishable Cargo Terminal in Jos. * Rehabilitation and re – commission of the NNPC depot in Jos * Completion of the Mangu Water supply
KWARA STATE 13 PROJECTS:
* Ilorin – Ibadan Road Fixed * Almajiri schools * e-wallet system in distribution of Agricultural inputs to farmers. * SURE – P Projects (Primary Health Care) * Rehabilitation of the Lagos – Jebba – Kano Rail Line, and Ilorin – Offa rail line. * Rehabilitation of Ilorin International Airport * CBN Project at Offa Grammar school * The Federal Government under ETF granted Uni-Ilorin ₦4.2 Billion in 2012 for the Unilorin Geological Research and Resort Centre at Aran – Orin, new faculty of Arts and Faculty of Education, Multi – Purpose hall, a central Research Laboratory and the automation of the University Library. * Dry Season farming in Kwara State at Tada – Shonga irrigation farm project * Irrigation Dam Project in Eyekonrin – Araromi * Ongoing 2 x 132kv line bays extension at Omu Aron * Construction of Perishable Cargo Terminal in Ilorin * Shonga Power sub – station * Supply of Instructional Materials to Federal Government College Ilorin Last Share on Facebook Share on Twitter Share on Delicious Share on Google+ Reply with quote Re: Breakdown Of Capital
SOUTH EAST GEO – POLITICAL ZONE
ENUGU STATE 18 PROJECTS:
* Rehabilitation of the Enugu Airport (New airport Terminal) * Ongoing Nsukka – Ayangba 132kv Double – Circuit * Sure – P Projects on Primary Health Care (PHC) * Enugu – PH – Maiduguri Rail Fixed. * University of Nigeria Teaching Hospital Enugu upgraded with new facilities to commence open – heart surgeries * Rehabilitation of Enugu – Port Harcourt Road * Ogrute – Umuida Road and Unadu to Odoru in Kogi State * Rehabilitation of Umuna – Ndiagu and Ebenebe Ezeagu Road, Agubuogu through Ebenebe to Iwolo road. * ₦ 2.57 Billion Dam Project in Adada River Dam to provide Portable Water, Electricity and Irrigation for agriculture activities * Ada Rice Irrigation Project at Uzo – Uwani * Erosion control project * Export Crop preservation and Conditioning Centre in Enugu State (One of the 10 constructed nationwide ) * e – wallet System in the distribution of agricultural inputs to the farmers and Dry Season Farming Project * Construction of Irrigation Facilities in Amagunze Rice Product farm Enugu * Establishment of Enugu State office of the National Productivity Centre. * In 2012, FG Commissioned a Cultural Industry Centre in Inyi Enugu State. * Reinstatement of washout at Km 6 + 750, Km 30 + 400 and Km 35 + 325 along Onitsha- Enugu Dual – Carriage way in Anambra and Enugu State. * Establishment of Maritime Institute at University of Nigeria Nsukka
EBONYI STATE 10 PROJECTS:
*Establishment of a Federal University in Ndufe – Alike in Ebonyi State *Rehabilitation of 43 KM Obiozara – Uburu – Ishiagu Road 37Km Oji – Achi Obeagu – Maku – Awgu – Ndeabor – Mpu – Okpanku – Akaeze Road rehabilitation. *Construction of a Storey Hostel, Class room building and Procurement at the Federal Government Girls College Ezembo, Ebonyi State *Sure – P Projects on Primary Health Centres and others *Rehabilitation of Abakaliki – Mbok Road *Establishment of a New Teaching Hospital *e – wallet system for the Distribution of Agricultural Inputs to the farmers and Dry Season Farming Project *Ongoing 2x 60MVA, 132/33KV Substation at Amasiri and 2 x 13KV Substation at Abakaliki and Abakaliki – Amasiri 132KV Double – Circuit Line *Rehabilitation of Agricultural – Skills Training Centre. *Establishment of National Obstetric Fistula Centre Abakiliki
ANAMBRA STATE 18 PROJECTS:
*Building of Aircraft Maintenance School at Akili – Ozuzo, Ogbaru Local Government Area. *Construction of Federal Government Secretariat in Awka *Exploring Public Private Partnership to Reconstruct Second Niger Bridge (Anambra – Delta States) *FGN Funded Ecological Projects in Anambra State : Nanka/Oko Landslide Project, the Nkisi Water Works *Erosion Control/Dredging Projects in Onitsha, the Okpolo/Ire Ojoto Erosion Control Project, Alor Town *Flood Control and Road Improvement Projects in Idemili Local Government Area *Rehabilitation of Onitsha – Owerri Road to Okija – Ihembosi – Afor – Ukpor – Ebenator – Ezenifite *Onitsha River Port – Fixed and ready *National Transmission Grid installed between Benin and Onitsha to prevent usual Nationwide Grid collapse *Sure – P Projects on Primary Health Care & Transformation *e – Wallet System in the distribution of agricultural inputs to the farmers and Dry Season Farming *Ongoing Nnewi 2 x 60MVA, 132/33KV Substation 2 x 60MVA, 132/33KV Substation at Oba and 2 x 132KV *Line Bays Extension at Nnewi, 2 x 60MVA, 132/33KV *Substation at Mpu with 2 x 60KV Line Bays Extension at Nnenwe *Onitsha – Oba – Nnewi – Ideato – Okigwe 132KV *Double – Circuit Line, Ugwuaji Nnenwe 132KV Double – Circuit Line 2 x 60MVA,132/33KV Substation at Nnenwe *Nnenwe – Mpu 132KV Double – Circuit Transmission Line, Onitsha – Ifitedunu and 2 x 132KV Double – Circuit Transmission Line, 2 x 60MVA, 132/33KV Substation at Ifitedunu and 2 x 132KV Line Bays Extension at Onitsha. *Modernisation of Nnamdi Azikwe University Teaching Hospital Nnewi
IMO STATE 15 PROJECTS:
*NDDC Projects: St Marks Estate and Federal Housing Estate Internal Road, New Owerri Ejizie – Izuogu Road in Akeme community of Arondizogu, and the Solar Powered Water Project at Mbaoma in Owerri North & Owerri Urban Water Scheme Project, Rehabilitation of Opkpuala – Iguruta Road(Imo and Rivers States), Reconstruction of Elele – Owerri Road Sea – Port and Naval Base Project in Osse – Motor *Community (World Bank /FGN/Imo state) sponsored project. *Construction of Administrative Complex and Entrepreneurial Studies Complex in Federal University of Technology Owerri (FUTO) *Construction of the new Federal High Court Owerri division complex *Establishment and Construction of a Court of Appeal Division in Owerri *14Km Mbaise – Ngwa Road with a bridge at Imo/ Abia State (Cost ₦2.94Billoin) *SURE – P Project on Primary Health Centres and other projects *Rehabilitation of Owerri – Port Harcourt Road *Ecological Control Projects at Nekede, Saint Kzito Secondary School in Muchina and the Umuoza – Ugri Erosion Control *Rehabilitation of the Sam Mbakwe International Airport Owerri *Egbema Power Plant (338MW) *e-wallet System in distribution of the agricultural inputs to the Farmers and Dry Season Farming Project *Ongoing Mbalano 2 x 30/40MVA, 132/33KV Substation and Okigwe 2 x 30/40MVA , 132/133KV Substation *Dualisation of Ada Owerri – Ikot – Ekpene Border Section Phase one in Imo, Abia and Akwa –Ibom States *Construction of Oguta River Port in Imo State
ABIA STATE 16 PROJECTS:
Completion of Alaoji Power Plant (1074MW) SURE – Projects on Primary Health Care (PHC) and others MDG Projects ( in partnership with the state Government) 250 Health Centres and 10 Solar Powered *Water Boreholes completed and commissioned *Rehabilitation of the Federal Roads: Mbaise – Ngwa Road with a bridge and Owerri – Aba Road *504MW Power Plant at Aba and 133KVA Substation in Umuahia (Under the Federal Government/Abia state Partnership Projects) *e – wallet system in the distribution of Agricultural Inputs to the farmers and Dry Season farming projects *Umuahia – Mbalano 132KV Line *Mbalano 2 x 30/40MVA, 132/33KV Substation *Ohafia 2 x 30/40MVA, 132/33KV Substation and Ohafia – Arochukwu 132KVA Line *Okigwe 2 x 30/40 MVA, 132/33KV Substation *Ongoing Ohafia 2 x 30 /40 MVA, 132/33KV Substation *Umuahia – Ohafia 132KV Single – Circuit Line, Umuahia – Mbalano 132KV Line, Ohafia – Arochukwu 132KV Line *Rehabilitation and Re – opening of the NNPC depot at Aba after 6years of closure. *Rehabilitation and Construction of Goodluck Jonathan Barrack in Ohafia *Establishment of Abia State Office of the National Productivity Centre. *Rehabilitation of Agricultural Skills Training Centre *NDDC – Obehia – Azumini – Ukanafun Road (Abia – Akwa Ibom) Roads Projects *Construction of a storey building for 136 Inmates at Aba Prison.
SOUTH WEST GEO – POLITICAL ZONE
ONDO STATE 22 PROJECTS:
*Omotosho I Power Plant Completed and commissioned *Omotosho II Power generating plant built from the scratch and commissioned. *Akure Airport One of the nine Airports remodelled *Benin – Ore – Shagamu duel carriage way rehabilitated after years of neglect *Akure – Ilesa express way rehabilitation *Sure – P Projects on Primary Health Care and Transportation *Erusu/ Arigidi Dam in Akoko North West Area of Ondo State under Benin – Owena River Basin Development Authority (BORBDA) *e – wallet System in Agricultural Inputs supply to the farmers *Dry Season Farming Projects *NNDC has a total of 589 Projects in Ondo State out of which 317 are already completed while 15 Mega Projects are ongoing such as Township road in Ugbo – nla, boreholes, interlocking road project, solar powered street light Projects etc. *Rehabilitation of Ipele – Idoani Road. *Construction of Federal Highway Emergency Clinics (Oka, Isua Akoko) *Periodic Maintenance of Akure – Owo Road. *2 x 60MVA, 132/33KV Substation at Okeagbe Akoko *2 x 60MVA, 132/33KV Substation at Ose Local *Government Area Headquarters Ondo State. *New Akure 2 x 150MVA, 330/132kv + 2 x 60MVA, 132/33KV Substation. *NDDC Water Project at Ukparam, ondo state *Establishment of a new Fed. Polytechnic at Ile – Oluji *In 2012, FG Commissioned at Cultural Industry Centre in Owo *Construction of MDG/NDE Skill Acquisition Centres in each of the 3 Senatorial districts of Ondo State. *Construction of Jetties at Igbokoda.
LAGOS STATE 17 PROJECTS:
Lagos – Kano Rail Revival Commissioning of New Air Conditioned Train Coaches and other rail way Services in Lagos *SURE – P Projects on Primary Health Centre. *e – Wallet System in the distribution of the agricultural inputs to the Farmers and the Dry Season Farming Projects. *Construction of Adiuyan water works phase II near Lagos *Third Mainland Bridge phase 2 *Apapa – Orile – Mile 2 – Cele, Oshodi road rehabilitated *The Federal Government under writes a ₦40B loan for infrastructural and educational development in Lagos (2014) *Rehabilitation of the Muritala Muhammed International Airport Lagos *Lagos – Sagamu road rehabilitated *Installation of 1000 Close Circuit Television (CCTV) cameras to boost security of lives and property *Ikorodu – odogunyan – Shagamu 132KV double circuit transmission line *2 x 60 MVA, 132/33KV Substation at Odogunyan and Ayobo with 132KV double – circuit transmission line Ikeja west – Ayobo. *Omotosho – Epe – Aja 330KV double – circuit transmission Line, Omotosho – Erukan – Ogijo 330KV double Circuit transmission line *Provision of additional 2 x 150MVA, 330 / 132KV Transformer capacity at Olorunsogo transmission station. *Federal Government College Laboratory refurbished in Ijanikin – Lagos. *Rehabilitation of the National Theatre Iganmu – lagos. *Establishment of Nigerian Army dog Centre at Ipaja lagos. *Establishment of Cancer Treatment Centre at the Federal Medical Centre, Ebutte Metta. *Establishment of Maritime Institute at the University of Lagos
EKITI STATE 6 PROJECTS:
*Establishment of a new Federal University in Oye – Ekiti *SURE – P Projects *e – wallet System in the distribution of the agricultural inputs to the farmers and the Dry Season farming projects *Rehabilitation of Ekon – Alaaye – Erinmo – Iwaraja road in Ekiti and Osun States *Omuo – Ifaki road of Ado – Ilumoba – Agbado Ikare Akoko Road sections A & B *Construction of Model Skill Acquisition Centre
OSUN STATE 7 PROJECTS:
*Ilesha Water Project (Ilesha Dam) *Ogun – Osun River Basin Projects and Ife Dam *e – wallet System in the distribution of the agricultural inputs to the farmers and the Dry Season farming Projects *Construction of Silos *Rehabilitation of Efon – Alaaye – Erinmo Ijesha – Iwarga Road ( Ekiti – Osun States) *Oshogbo – Ede 13KV double – circuit transmission line, 2 x 60MVA, 132/ 33KV Substation at Ede *Modernisation of Obafemi Awolowo University (OAU) Teaching Hospital Ile – Ife to meet International standard.
OYO STATE 16 PROJECTS:
*Rehabilitation of the Ibadan – Ilorin Road (Dualization of road) *Rehabilitation of the Ibadan – Lagos Road *Lagos – Ibadan new gauge Rail Line Service *University college Hospital Ibadan upgrade with facilities to commence open heart surgeries *SURE – P Projects in Primary Health Care *e – Wallet system in the distribution of the Agricultural Inputs to the farmers and the Dry season Farming Projects. *Rehabilitation of the Ibadan Air port. *Ibadan – Oyo road dualisation *Construction/ Rehabilitation of Gbogan – Iwo Road *Rehabilitation of Odo oba – Takie – Gambari otte in Oyo/Kwara States *Rehabilitation of the Old Oyo – Ogbomosho Road *2 x 60MVA, 132/33KV substation at Igangan and 132KV switching station at Igboora *New Abeokuta – Igboora – Lanlate 132KV double Circuit Transmission Line and 132KV Tee – off at Igboora – Igangan *Ganmo – Ogbomosho 132 KV Double – Circuit transmission line and 2 x 60MVA,132KV Substation at Ogbomosho *2 x 30/40MVA, 132/ 33KV Substation at Lanlate *Renovation of the Obafemi Awolowo Stadium Ibadan
OGUN STATE 7 PROJECTS:
*Olorunsogo Power Plant (750MW) successfully completed and privatised *The Procter & Gamble Plant in Agbara Ogun States has been commission(March 17,2014) *e – wallet System in the Distribution of the agricultural inputs to the farmers *Dry Season Farming Projects *Lagos – Sagamu – Ore road rehabilitation *Rehabilitation/ Construction of Ijebu Igbo Ajegunle – Araromi – Ife – Sekona Road (Section II) in Ogun State *Rehabilitation of Otta – Owode Road in Ogun State
SOUTH – SOUTH GEO – POLITICAL ZONE
EDO STATE 14 PROJECTS:
* Ihovbor power Station (451 MW) *Rehabilitation of Benin – Ore – Sagamu dual carriage way.* Asphalt overlay of 2km access road to the federal Science & Technical College on Uromi Emergency reinstatement of washout/gully erosion at KM 127 + 000 at Auchi along Okene – Benin road* 14 + 000 Km along Auchi Agenebode Road* Benin – Auchi road rehabilitation * dualised SURE – P Projects on Primary Health Care (PHC) Ukpoke *irrigation Projects Water supply projects in Northern Ishan of Edo State (9 million litres per day plant capacity) for Uromi, Ubiaja, Ugengu, Ugboha and Igueben *1 x 60 MVA , 132/ 33kv Substation reinforcement at Ukpilla substation* 2nd Benin – Onitha 330kv single – Circuit line Land reclamation * Erosion Control works project at Igonton – Igbanke * Iyom/Okhelen – Awo road Uromi Modernisation of University of Benin Teaching Hospital, Benin.* NDDC Reconstruction of Benin – Abraka phase I in 2012, *FG Commissioned a cultural Industry Centre in Auchi, Edo state. *Construction of Jetties at Agenebode
DELTA STATE 18 PROJECTS:
* Ongoing construction of Itakpe – Ajaokuta – warri modern railway * Inauguration of Illah irrigation project. * Second Niger Bridge – on going with SURE – P funds * SURE – P Projects on Primary Health Care (PHC) * Rehabilitation of Warri Refinery and the access roads to the Refinery * The NNDC Sponsored Projects: Nurse quarters, electricity projects ultra modern Health Centre and Solar Powered Water project * Supply and installation of Laboratory equipment at federal University of Petroleum Resources Effurun * e – wallet system in the distribution of agricultural inputs to the farmers and the Dry Season farming projects * New Library Projects at the Federal at the federal Government College (FGC) Warri and at the federal Government Girls College Ibusa * The Proposed $16 B Gas City Project at Ogidigben in Warri South West Area of Delta State to host: A gas processing plant, a fertilizer plant and a petro chemical plant Sea Port * 1 x 60 MVA Substation at Ughelli Power Plant and 1 x 30/40 MVA Substation reinforcement at Amukpe * NDDC Construction of Orhorbo – Odurubuo, Kpakama – Bomadi road phase I, Gberegolor – Ogriagbene Road * Land reclamation and erosion control works projects in Kurutie, Gbaramatu Clan Warri South, and Idumuje – Unor Erosion Control Project. * Canalization of Odobou – Ogbobagbene creek in Burutu LGA * Construction of Model Skill Acquisition Centre and the Rehabilitation of Agric – skills Training Centre. * Completion of the Capital dredging of the Lower River Niger from Warri (Delta state) to Baro (Niger State) 532km. * Supply of instruction materials to the Federal Government College Warri * Establishment of the Nigerian Maritime University and the NIMASA Shipyard & Dockyard at Okerekoko Warri
CROSS RIVER STATE 14 PROJECTS:
* Qua Falls Dam and Irrigation Project, Dry season Farming and e – wallet system in the distribution of agricultural inputs to the farmers * Construction of an Export Crop Preservation and conditioning centre * Ongoing Obudu – Ogoja 132kv Double – Circuit Transmission line, 2 x 30/40 MVA 132 /33kv Substation at Ogoja * Sure – P Projects on Primary Health Care and others. * Periodic maintenance of Rumukurshi – Chokocho road; Reconstruction & Pavement strengthening of Ikom – Mfum Road * Revitalised Calabar Substation (561mw) * Rehabilitation of Ikom – Mfum (Cross River) – Abakiliki – Mbok (Ebonyi) * Construction of Calabar – Ikom – Katsina – Ala Road in Benue state * Rehabilitation of Margaret Ekpo International Airport Calabar * NDDC Ubana Utanga Water Project * NDDC Electrification Project * Modernisation of the University of Calabar Teaching Hospital * Land Reclamation and Erosion control works project in Essien town – Ekorin in community. * Construction of Agric Skills Training Centre in Cross River state.
AKWA IBOM STATE 13 PROJECTS:
* Complete of Nkari Earth dam * Construction of 100,000 metric tonnes capacity silos * e – wallet system in the distribution of agricultural inputs to the farmers and the Dry season farming projects * SURE – P Projects on Primary Health Care (PHC) * Establishment of a new Federal Polytechnic in Ukana * Approved building of Ibaka Deep Seaport * Ibedu/Ibiako Rural Electrification Projects (Under NREP) with JICA’S grant aid Intervention * Land reclamation and erosion control works project in Ibakang Nsit – Ikot Ekpo – Unyene Road, * Nsit Attai in Akwa Ibom State. * Remediation, Rehabilitation and Restoration of the Oil impacted site at stubbs Creek, Eket –Akwa Ibom. * NDDC –Idoro – Eaten – Itam Water Project * Akwa Ibom State office of National Productivity Centre was established * Construction of 3 MDG/NDE skill Acquisition centres in each of the three Senatorial Districts in Akwa Ibom
RIVERS STATE 13 PROJECTS:
* Revived Omoku sub power station (225mw) * Port Harcourt – Enugu – Maiduguri Rail Fixed * Owerri – Port Harcourt Road ( Ongoing) * SURE – P Projects on Primary Health Care (PHC) * e – wallet in the distribution of subsided agricultural inputs to the farmers and Dry Season farming Projects * Rehabilitation of the Port Harcourt International Airport. * NDDC Electrification projects in Khana LGA and Eleme * 10 rooms hostel at Immigration Training School at Ahoada * Construction of Jetties at Degena. * Establishment of Cancer Treatment Centre in UNIPORT Teaching Hospital. * Ongoing Rehabilitation of the Port Harcourt Refinery * Transformation of the Onne Oil and Gas Free Zone with 6 billion USD invested leading to the attraction of 150 companies into the zone with 30,000 jobs created to date * Establishment of a new Federal Oil and Gas Polytechnic at Bonny
BAYELSA STATE 10 PROJECTS:
* Periodic maintenance of East – West – Odi Road * Gbarain sub power station (225mw) revitalized * Establishment of a new federal University in Otuoke * SURE – P Project on Primary Health Care (PHC) * e –wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season Farming Projects * Construction of the federal Government Secretariat in Yanagoa. * Central Ogbia Regional Water Supply Project in Otuoke * Construction of Jetties at Yenogoa * NDDC Electrification Projects in Peremabiri – Ogbokiri in Akassa Bayelsa State. * Establishment of Maritime Institute at the Niger Delta University Amasoma. breakdown-capital-projects-executed- by-goodluc-jonathan-lead-federal-government-across-states-of-Nigeria.