If you decide to install Compass ceramic pool, you will receive detailed documentation for constructing company.
Excavation plan
2. Excavations
After a careful measurement the excavations begin.
Compass pool construction – excavationsCeramic pool installation – earth works with an excavatorCompass ceramic pool installation – excavation
3. Preparation of the pool subsoil
The excavation bottom is filled with a subsoil layer of washed round gravel, poured on a geotextile and rammed. It´s also possible to prepare a concrete base plate, but Compass ceramic pool installation doesn´t require it, gravel bed settles the pool sufficiently.
Ceramic pool installation – gravel bed
4. Pool transportation and placing
The next step is to transport the pool and place it on the base plate or gravel bed.
Pool construction – placing the ceramic pool with a cranePool construction – settling the pool with a craneCompas Pools ceramic pools installation
5. Technology installation and backfilling
Once the skimmer, inlet nozzles, lights, hoses and pipes are fitted, the pool is gradually backfilled around by dry concrete mixture or gravel. At the same time pool is filled by water to balance the pressure exerted on the walls.
The space under the stairs is always filled with dry concrete.
Ceramic pool installation and backfilling by dry concrete mixture
FIG. Ceramic pool installation and backfilling by dry concrete mixture
FIG.
Filling the JAVA pool with water
6. Technology installation in the shaft
Once the pool is settled, the pool technology installation begins – either in the pool shaft or in a room designated for this purpose (garage, basement, garden shed).
Ceramic pool installation and pool technology shafttechnology shaft
7. Pool roofing
Roofing rails are settled onto the concrete pool ring (if they are going to be imbedded at the paving level), or are settled after the tiles are layed.
Settling the rails of pool roofing
8. Tiling around the pool
Laying the tiles around the JAVA poollaying the ceramic edge of the pool
9. Roofing installation
construction with roofingLandscaping works in the surroundingCompleted JAVA 85 ceramic pool installation
10. It´s done…
… let´s go swimming.
Completed JAVA 85 ceramic pool installation – ready to swim